Skip to content

Spec-ing out the new motor

May 5, 2012

Alan stopped by tonite and between beers we managed to pull the new motor the rest of the way down. The crank and rods look fantastic, bearings show very little wear for being stamped 2-87 and everything else inside the block looks almost as new. Next to break down the head and then send everything off to the machine shop for cleaning and get the crank cross drilled and polished. Meanwhile Sam found an LSD trans for my car and is hooking it up for me as well as a third set of phone dial rims for my car as well. To top this all off, the new windshield for Sam’s car is ready and may be installed tomorrow some time since the one we picked up at the junkyard apparently had a small crack that turned into a big one. Busy times in the 944 garage!

Advertisements

From → Uncategorized

Leave a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: